
What GeoWest Does
GeoWest maps and analyzes infrastructure data, including roads, bridges, power and sewer lines, telecom routes, and other utilities. We find least-cost solutions, convert CAD infrastructure data to GIS format and vice-versa, and georeference (i.e., spatially locate) infrastructure data from CAD drawings to real-world coordinates.
Del's Experience
Del worked on over 50 projects during the 12 years he was with Parsons Brinckerhoff (now WSP) engineering consultants in Portland and Seattle, including some of the largest infrastructure projects in America during that time. Working each day with engineers and transportation planners at PB, he learned a great deal about transportation engineering and infrastructure.
He taught himself CAD in 1995 while at PB, then he spent a year drafting highway and freeway bridges while working with a team of structural engineers. A year later, he wrote the 417-page Systems Overview Manual for the Hawaii DOT, which described the new $1.3 billion Interstate H-3 freeway and tunnel system on the island of Oahu, one of the most complex freeway systems ever built. He also created extensive maps to describe the different tunnel systems. Interstate H-3 was named “Project of the Year” in 1997 by the American Society of Civil Engineers (ASCE).
Del joined Otak engineering consultants in Portland in 2006 as the company’s GIS Manager and worked on numerous infrastructure projects over the next five years. This included the $1 million Al Gharbia Infrastructure Framework project in the United Arab Emirates. During that year-long project, he worked extensively with civil engineers to map new electrical and sewer lines for Mirfa, a rapidly growing city in the U.A.E. with a projected future population of 75,000. Del converted Mirfa’s many utility plans from AutoCAD to GIS format and then back to CAD, editing the infrastructure plans as needed using both GIS and CAD.
![]() |
|
A field visit to the new Metro transit system in Doha, Qatar, in 2015. Del converted the CAD plans for this system to GIS format so engineers could analyze the spatial relationship of this system to other infrastructure. |
He also worked on several infrastructure projects in Doha, Qatar, when he was a Senior GIS Analyst in the Central Planning Office there with Atkins engineering, from 2013 to 2016. At Atkins, he converted numerous CAD plans of Doha’s new subway and rail transit system, which was under construction, to GIS format so engineers and planners in the office could better analyze them.
In 2022, after returning to Oregon, Del converted Metro’s infrastructure data for the St. John’s Landfill and Central Transfer Station, in the Portland area, from AutoCAD to GIS format to help Metro’s on-site staff during emergency response. And he spent more than a year, from 2023 to 2024, working with telecom data for CTC Technology, mapping proposed fiber-optic lines in Virginia Beach, Virginia. He led a team of five GIS analysts for this project and created hundreds of PDF and web-based maps showing the location of proposed fiber-optic lines and handholes in relation to other infrastructure in a 33-mile long corridor in Virginia Beach.
Del has used AutoCAD and other engineering software extensively on numerous infrastructure projects throughout his career. In fact, he’s one of the few GIS specialists in the Northwest who also has a strong professional background in CAD. With his extensive experience in CAD and engineering, your infrastructure GIS projects will get done faster, better and cheaper at GeoWest.
