Spatial analysis

What GeoWest Does

GeoWest analyzes and displays geospatial data to help decision-makers answer questions and solve problems. This includes, for example, performing locational analysis and siting, such as determining the best location for a new school or park based on spatial data, or calculating the number of residential taxlots within, say, a half mile of a proposed industrial site. 

Del's Experience

Del has worked on dozens of spatial analysis projects since the 1990s. For example, he spent several months working with the City of Happy Valley, Oregon, in 2008 through his company, Otak, using the ArcGIS Spatial Analyst extension to analyze topography and land use. By doing this, he was able to determine the amount of buildable land in different zoning and slope categories. He did a similar slope analysis the following year for the West Bull Mountain area in Washington County.

One of his most challenging spatial analysis projects, however, was the South/North Light Rail Corridor Study in Portland in 1994. As a GIS analyst with Parsons Brinckerhoff consulting engineers (now WSP), he worked on this project with staff from TriMet and Metro, Portland’s transit agency and regional government agency, respectively. TriMet wanted to know which of 36 potential sites for light rail transit (LRT) stations in Portland, in a proposed corridor along the east side of the Willamette River from Milwaukie in the south to St. Johns in the north, would likely attract the most pedestrian use.

Del spent four months on this project. First, using Esri’s Network extension, he created a model of pedestrian behavior that incorporated existing walkways and sidewalks while accounting for slope, average stopping time at signalized intersections and other factors that affect pedestrian mobility. He then used this GIS model and the Network extension to create five- and ten-minute “walkzones” that emanated from each potential LRT station location.

These polygons were overlaid onto population data to estimate the potential pedestrian use for each candidate site, then the 36 sites were ranked. TriMet used this information in their decision-making for transit station siting in what eventually became the Yellow LRT Line to the north and the Orange LRT Line to the south.

This was one of the first times GIS had been used in North America to determine the optimal locations of LRT stations based on modeled pedestrian behavior. Del presented a paper on this project at the 1995 Esri Northwest User’s Conference in Idaho.